Just days after a devastating fire destroyed the original BP Mart in Tripoli, WI, I drove by the charred remains of the old convenience store. A feeling of sympathy came over me, but I didn’t stop—didn’t want to be that guy. Three months later, I got a call from Mark, the owner, who had been given the run-around too many times by unreliable builders. Through a mutual connection, we were recommended to Mark because of our commitment to quality work and customer experience. After one meeting with Mark and Darcy, we hit it off—and the rest is history.
What followed was a collaborative rebuild that brought the community a modern, functional, and sharp-looking store that locals can be proud of. From groundbreaking in October 2023 to completion in May 2024, this project was a total transformation and a testament to what happens when the right people come together.
Building Specifications
Convenience Store Structure
- Size: 56’ wide x 65’ long with Internal Clear Height (ICH): 12’
Front & back porches that are 6’ deep and feature a Gable-style front entrance
Raised lower chord trusses for vaulted interior ceiling
Attached Office
- Size: 56’ wide x 29’ long with Internal Clear Height (ICH): 12’
Exterior Finishes
- Roof: Crinkle Black steel
- Walls: Dark Gray Oak steel
- Wainscot: Versetta Stone in Northern Ash color
- Roof pitch: 5/12 with 24” overhangs
- Snow management: Two rows of snow stop trim
Features
- Epoxy flooring throughout—frequently complimented and a major conversation piece with customers
- Full-service convenience store with hot food/prepared meals
- Gasoline and diesel fuel pumps
- On-site propane distribution (Tripoli Propane)